在安裝大跨距橋架的時候,必要根據橋架工程的預埋要求進行安裝,如許才能將橋架固定的更加的堅固,在橋架布線的時候應消滅槽內的污物和水;在部署纜線之前,檢查好橋架型號規格、路線和位置是否吻合設計要求,吻合之后在進行安裝,為了幫助大家更好的安裝橋架,接下來
山東電纜橋架廠家將為大家介紹一下橋架的特別預埋以及布線要求。
When installing the long-span bridge, it is necessary to install it according to the embedded requirements of the bridge project, so that the bridge can be fixed more firmly. When wiring the bridge, the dirt and water in the groove should be eliminated; Before deploying cables, check whether the model, specification, route and location of the cable tray meet the design requirements, and then install it. In order to help you better install the cable tray, the Shandong cable tray manufacturer will introduce the special embedment and wiring requirements of the cable tray.
根據本工程的特別預埋要求
According to the special embedded requirements of the project
根據本工程建筑為混凝土的特點,橋架安裝施工前應細致以下幾點:
According to the characteristics of concrete construction in this project, the following points should be carefully before the bridge installation:
①、根據弱電管道系統的設計,在混凝土未進行防腐處理前,應在混凝土支持處預先燒制橋架支持角鐵,以便為橋架安裝預備固定件。
① According to the design of the weak current pipeline system, the bridge support angle iron shall be pre-fired at the concrete support before the concrete is subject to anti-corrosion treatment, so as to prepare the fixing parts for the bridge installation.
②、橋架支架應固定在支持角鐵上,支持角鐵和支架應進行防腐處理,以免影響混凝土質量。
② The bridge support shall be fixed on the support angle iron, and the support angle iron and support shall be subject to anti-corrosion treatment to avoid affecting the concrete quality.

③、支、吊架安裝:
③ Installation of supports and hangers:
要求所用鋼材應平直無顯明變形。下料后,長度誤差應在5毫米以內,切口不應有卷邊或毛刺;分支和吊架應安裝牢固,以確保水平和垂直;通常,固定支點之間的距離不應大于1.5-2.0毫米.
The steel used shall be flat and straight without obvious deformation. After blanking, the length error shall be within 5mm, and the cut shall be free of curling or burr; Branches and hangers shall be installed firmly to ensure horizontal and vertical; Generally, the distance between fixed fulcrums should not be greater than 1.5-2.0 mm
在進出接線盒、箱、柜、匝、角和丁字接頭的三個端點的500范圍內,應設置固定支架。點支和吊架的規格一樣平常不應小于30毫米*3毫米扁鐵和25毫米*25毫米*3毫米扁鋼。
Fixed supports shall be set within 500 of the three ends of the junction box, box, cabinet, turn, corner and T-joint. The specification of point support and hanger shall not be less than 30mm * 3mm flat iron and 25mm * 25mm * 3mm flat steel.
大跨距橋架的布線要求
Wiring requirements for long-span bridge
橋架接線前,應消滅槽內的污物和水;在部署纜線,之前,應檢查型號規格、程序、路線和位置是否吻合設計要求。
Before wiring the bridge, the dirt and water in the groove shall be eliminated; Before deploying cables, check whether the model, specification, procedure, route and location meet the design requirements.
統一橋中包括絕緣在內的導體橫截面積之和不應超過內部橫截面積的40%;纜線的布料應該是直的成都人事考試,沒有扭曲和結圈,不應該被外力擠壓和損壞;部署前應在纜線兩端貼上標簽,標明起點和盡頭位置;標簽字跡應清晰;精確無誤。建筑物內的電源線、信號電纜、雙絞線、光纜等弱電系統的纜線應分開布置。
The sum of the cross-sectional areas of conductors including insulation in the unified bridge shall not exceed 40% of the internal cross-sectional area; The cable cloth should be straight and free from twists and knots, and should not be squeezed and damaged by external forces; Before deployment, labels shall be pasted on both ends of the cable to indicate the starting and ending positions; The label should be legible; Accurate. Cables for weak current systems such as power lines, signal cables, twisted pairs and optical cables in buildings shall be arranged separately.
纜線之間的凈距應知足設計要求;部署纜線時應提供冗余。在交接室和設備室;絞合電纜的預留長度一樣平常為3-6m。工作區是0.3到0.6米;設備端光纜的預留長度一樣平常為5-10米;如有特別要求,應按設計要求預留長度,纜線布。
The clear distance between cables shall meet the design requirements; Redundancy shall be provided when deploying cables. In the handover room and equipment room; The reserved length of stranded cable is usually 3-6m. The working area is 0.3 to 0.6 meters; The reserved length of the optical cable at the equipment end is usually 5-10 meters; If there are special requirements, the length and cable layout shall be reserved according to the design requirements.
關于問題上述內容中已經為大家介紹完了,從中我們了解橋架的安裝工作很緊張,我們在安裝橋架的時候,肯定要牢牢的遵守上面的要求,根據要求進行安裝,橋架才能更好的固定,信賴大家看完之后會對此有新的熟悉和了解。更多相關內容就來我們網站
http://www.yeeones.com咨詢吧!
The above content has been introduced to you. From it, we know that the bridge installation work is very tense. When we install the bridge, we must firmly abide by the above requirements, and install according to the requirements, so that the bridge can be better fixed. I trust you will have a new understanding and understanding after reading it. Come to our website for more relevant content http://www.yeeones.com Ask!